Login       My Wishlist
  My Cart
$0.00 / 0 items
 
The Animal Shelter
Helping You Care For the Animal In Your Life
 
International Access
Global Shipping Options Available
  Our Catalog   Leashes   Training Leashes

Pettom Nylon Training Dog Leash Gear Cotton Web Long Lead Dog traction rope Great for Teaching, Play, Camping, or Backyard For Large,Medium and Small Dogs (M 20 Ft)


Mega Sale! Save 28% on the Pettom Nylon Training Dog Leash Gear Cotton Web Long Lead Dog traction rope Great for Teaching, Play, Camping, or Backyard For Large,Medium and Small Dogs (M 20 Ft) by Pettom at The Animal Shelter. MPN: Pettom-22096. Hurry! Limited time offer. Offer valid only while supplies last.   Mainly Feature :  1)Material: high quality nylon material, durable.  2)Comfortable handle design: handle plus a soft lining, comfortable


Product Description

  Mainly Feature :

  1)Material: high quality nylon material, durable.

  2)Comfortable handle design: handle plus a soft lining, comfortable without Lehua.

  3)D-ring buckle design: You can hang storage bags, garbage bags and so on

  4)Three size options: According to their dog size and dog training, choose for themselves and their dog's traction length.

SAFETY AND DURABILITY FOR YOUR BIG DOG

Long Trainer 1 inch nylon dog leash is built strong with high quality nylon for large dogs. As opposed to cotton leashes, nylon will hold up when handling big dogs. Cotton leashes can break easily and you will regret not investing! Long Trainer 1 inch is built with heavy duty materials made for daily use over an extended period of time. Great for your large dog!

COILING SYSTEM
Long leashes can get tangled easily when storing and moving leaving you with a big mess. Our Hook and Loop Coiling System makes transporting your leash easy. Simply coil up your leash normally and then wrap the strap around it. Secure the hook and loop closure on itself annylon will hold up when handling big dogs. Cotton leashes can break easily and you will regret not investing! Long Trainer 1 inch is built with heavy duty materials made for daily use over an extended period of time. Great for your large dog!

COILING SYSTEM
Long leashes can get tangled easily when storing and moving leaving you with a big mess. Our Hook and Loop Coiling System makes transporting your leash easy. Simply coil up your leash normally and then wrap the strap around it. Secure the hook and loop closure on itself and you are ready to go.

SIZING
20 Feet: Great for exploratory walking, potty with shorter range.
30 Feet: Close ball play, using the potty with freedom.
50 Feet: Recall training, playing with tennis balls, total playing freedom, off-leash simulation.

Features & Highlights

  • LONG LEASH-This training leash is great for teaching your dog recalls. Long leash allows dog for more wandering area and freedom, great choice for dog training,strolling, walking, playing, teaching.
  • SUPER TRAINING LEAD- This durable, long, nylon dog leash will outlast cotton leashes. Our long dog leash is great for small and medium and large dogs.
  • COMFORTABLE DESIGN: handle plus a soft lining, comfortable without Lehua.
  • D-RING BUCKLE & CLIP DESIGN: You can hang storage bags, garbage bags and so on. And the nickel plated clip swivels to resist twisting
  • DIMENSIONS - This dog leash measures by 20ft/30ft/50ft long. Great for hiking, camping, training.

Additional Information

Manufacturer:PETTOM
Brand:Pettom
Color:Black 1
Part Number:Pettom-22096
Publisher:PETTOM
Studio:PETTOM
MPN:Pettom-22096
Item Weight:1 pounds
Item Size:5 x 5 x 5 inches
Package Weight:1 pounds
Package Size:5 x 5 x 5 inches

Pettom Nylon Training Dog Leash Gear Cotton Web Long Lead Dog traction rope Great for Teaching, Play, Camping, or Backyard For Large,Medium and Small Dogs (M 20 Ft) by Pettom

Buy Now:
Pettom Nylon Training Dog Leash Gear Cotton Web Long Lead Dog traction rope Great for Teaching, Play, Camping, or Backyard For Large,Medium and Small Dogs (M 20 Ft)

Brand: Pettom
4.1 out of 5 stars with 58 reviews
Condition: New
Lead Time: 1 - 2 Business Days
Availability: In Stock
$35.99
$25.99
You Save: 28%


Quantity:  

 


View More In Training Leashes.

 


Have questions about this item, or would like to inquire about a custom or bulk order?


If you have any questions about this product by Pettom, contact us by completing and submitting the form below. If you are looking for a specif part number, please include it with your message.

First Name:
Last Last:
Email Address:
Your Message:

Related Best Sellers


FAYOGOO Lucky Pup Cotton Rope Leash for Dogs- Durable, Style and Comfort- 5 Ft. Handmade Natural White Braided Lead for Women, Men and Kids (Small Medium Large Dogs)
By FAYOGOO
mpn: DL-1001, ean: 0867325000333,
This heavy duty cotton rope dog leash is perfect for your medium to large size dog.YOU WILL NEVER HAVE TO BUY ANOTHER DOG LEASH AGAIN- Our 100% heavy duty cotton rope dog leash is so well constructed and heavy duty it will last you a lifetime!. BEAUT...

Berry Pet Leather Dog Leash, Braided Pet Lead for Medium/Large Dogs Training & Walking,3/4" width 4 feet Black
By Berry Pet
mpn: XYL011BL48, ean: 0701256560309,
If you want a set,the collar(B00LHQEF4I) must be perfect to match. About returns policy: If you are not satisfied with our product or order wrong item, let us know at the first time, we promise to reply you in 24 hours. If we make a mistake, we p...

LupinePet Originals 1" Jelly Roll 6-foot Padded Handle Leash for Medium and Larger Dogs
By LupinePet
mpn: 96959, ean: 0746889969594,
All Lupine products are proudly built in Conway, New Hampshire and Guaranteed (Even if Chewed). Made from jacquard woven nylon, with the pattern woven into the webbing (never printed or sewn on!) Features strong bar-tack stitching, unique padded hand...

4 Foot Dog Kennel Slip Lead Heavy Duty Nylon Pack of 10 by Midlee
By Midlee
ean: 0819020023889,
4 feet long x 1/2 inch wide. Pack of 10 various colors. Unique combination of leash and collar. The handle end of the leash slips through the o- ring to from a collar. Makes transporting dogs safe. Great for veterinarians, groomers, shelters, dog wal...

NOBER Long Leash Training Lead 16 33 Feet 1 Inch Wide for Dogs Extra Durable Line Handle Rope
By NOBER
mpn: ndll101b, ean: 0714131657407,
Feature a high quality plated hardware for extra durability. Available in lengths from 16 feet to 130 feet. Nylon fabric with high density webbing to add durability. Extra-long leash allows dog for more wandering area and freedom, great choice for do...

Peteast Multifunctional Dog Leash, Adjustable Reflective 8.3ft Long Dog Training and Walking Leash for Small, Medium and Large Dogs
By Peteast
mpn: 43237-2, ean: 0724190518861,
Enjoy walking your dogs with Peteast Multifunctional dog leash! Peteast dog belt is designed to solve your issue to walk your puppies in different situation. Whether walking only one dog or two at the same time, this leash will be a nice choice for y...

Moonpet Soft and Extra Durable Real Genuine Full Grain Leather Dog Training Leash Lead - Premium Heavy Duty 4 ft x 4/5 Inch - Best for male/female Medium/Large Breeds - Light Brown
By Moonpet
mpn: LE005-LBR, ean: 0600380441129,
It's important for both owners and dogs that general obedience training is an essential part of owner your pet. It's not only good for their behavior, but helps provide a sense of pride for your pet. 1.The lead is made of 100% full grain genuine leat...

LeRich 15FT/20FT/30FT/50FT Long 3 Color Nylon Pet Dog Cat Puppy Tracking Training Obedience Lead Leash (30 Foot, Black)
By LeRich
ean: 0763230738555,
Material: durable nylon and metal hook Length: 5FT/10FT/20FT/30FT/40FT Width: 2.5cm/1 inch Color: Black/Blue/Red Features: 1. The leash is strong enough to support the handling of large sized dogs and not too heavy for smaller ones. 2. The lead wil...

Grand Line Reflective Climbing Rope Slip Lead Pets Leash for Small, Medium, Large and Extra Heavy Dogs and Cats - 5 Ft Long
By Grand Line
mpn: 43237-2, ean: 0762988868590,
Grand Line Pets Supply Our rope slip lead pets leash is built for active dog use during training, walking, jogging, hiking, on the beach, or wherever full control is necessary. 1. Dependable quality, made for small, medium, large or duty pet, cat, ...

Guiding Star Brown 10ft Braided Leather Dog Training Leash with Copper Hook, Heavy Duty Dog Leash for Large, Medium and Small Dogs, Two Sizes for Your Choice
By Guiding Star
mpn: DpBr25cm85g41, ean: 0799123786457,
How to identify genuine leather:1. Touch. Touch the leather surface, real leather makes you feel smooth, soft and flexible, man-made synthetic leather stiff and rough.2. Smell. Genuine leather generates the leather smell, but faux leather has irritan...



Privacy Policy / Terms of Service
© 2019 - theanimalshelter.net. All Rights Reserved.